Retaining Wall Calculator

A rough DIY materials and labour estimate for a straightforward timber post-and-board retaining wall. Enter your wall length, retained height, and ground conditions to start — then tap any post in the diagram to set its own ground level and top level by hand; posts in between rake (slope evenly) between whichever posts you've set.

Using "Default" calculation settings.

Elevation

Post Concrete/gravel fill Facing boards Top/perimeter board Set by hand — others rake between these Corner post — boards break here, never run through Board joint — staggered row to row, always lands on a post

Tap a post to set its ground level and top level by hand.

Posts

100 x 100mm
5
Total fill (concrete/gravel)
0.21 m³

Embeds deeper than a simple fence post — it has to resist the retained soil's push over its whole buried length, not just wind load.

Boards

Facing boards
12
Facing — continuous (2-span)
8
Facing — single-span joint
4
Top/perimeter board
3
Top board — continuous (2-span)
1
Top board — single-span joint
2
Total boards, all layers
15
Total length, all layers
30.00 m
Standard length assumed
3.0 m

Every layer (facing courses, the top/perimeter board, and the cap if enabled) is planned as real cut pieces: continuous across two post spans wherever it fits, breaking to a single span only where a corner, an excluded bay, or the standard length forces it. Where joints can't be avoided, each row's joints are staggered onto different posts than the row below — see the elevation diagram's join marks.

Drainage backfill

Volume
0.75 m³

Compacted free-draining gravel behind the facing boards, roughly 150mm thick.

Rough labour estimate

Setup & marking out
1.5 hr
Posts (dig, set, fill)
7.5 hr
Rails / facing boards
6.0 hr
Backfill placement (drainage gravel)
0.4 hr
Total
15.4 hr

Rough guide for one experienced DIYer working alone — add time for a helper-dependent job, hard ground, or bad weather.

Rule-of-thumb estimate for straightforward ground and access — not an engineered design. Ground conditions vary a lot in practice; if in doubt, especially near a boundary, driveway, or structure, get a professional opinion before you dig.